HOMAN — Refined Supply GET A QUOTE
PavingGB/T 15180

Bitumen AH-70 (GB/T 15180)

Paving bitumen supplied against the Chinese national standard GB/T 15180 designation AH-70, for projects whose specification and inspection regime are written to that system.

In short

AH-70 is the heavy-traffic paving bitumen grade of the Chinese national standard GB/T 15180, with penetration of 60–80 dmm and ductility at 15 °C of at least 100 cm. HOMAN supplies it to projects whose specification and inspection are written to GB/T, including Chinese-contractor road works, in drums, jumbo bags, flexitanks or bulk.

Grade choice

AH-70 is for projects whose specification and inspection regime are written to GB/T 15180. It is not interchangeable with ASTM penetration grades or IS 73 viscosity grades unless the buyer’s engineer accepts that substitution in writing.

Designation
AH70
Key property
Chinese paving grade AH-70
Family
Paving
Documentation
COA per order lot
HOMAN 180 kg steel drum of Bitumen AH-70 (GB/T 15180), batch-numbered for export
180 kg drum · also jumbo bag, flexitank & bulk
01 · PropertiesTest methods

Technical properties

Each row names the test method the value is measured by, so your inspection lab can reproduce it.

Technical properties of Bitumen AH-70 (GB/T 15180) with test methods
PropertyUnitTest methodSpecification
Penetration at 25 °C, 100 g, 5 s0.1 mmJTG E20 T 060460–80
Penetration index (PI)—JTG E20 T 0604−1.5 to +1.0
Softening point (R&B)°CJTG E20 T 0606Min 46
Dynamic viscosity at 60 °CPa·sJTG E20 T 0620Min 180
Ductility at 15 °C, 5 cm/mincmJTG E20 T 0605Min 100
Ductility at 10 °C, 5 cm/min ²cmJTG E20 T 0605Min 20
Wax content (distillation)% m/mJTG E20 T 0615Max 2.2
Flash point (Cleveland open cup)°CJTG E20 T 0611Min 260
Solubility in trichloroethylene% m/mJTG E20 T 0607Min 99.5
Density at 15 °Cg/cm³JTG E20 T 06031.000–1.060
Retained penetration ratio (RTFOT residue)%JTG E20 T 0604Min 61
Residue ductility at 10 °C ²cmJTG E20 T 0605Min 6

Specification limits per the HOMAN technical datasheet. Every lot is lab-tested in Bandar Abbas before shipment. Pre-shipment inspection is carried out by SGS or Geochem, as the buyer chooses. A Certificate of Analysis (COA) is issued for each order lot and tied to the batch number on the packaging.

Datasheet issued by the HOMAN technical team · Lot testing: Bandar Abbas laboratory · Inspection: SGS or Geochem

Bitumen AH-70 (GB/T 15180) — technical datasheet PDF, 95 KB — properties, test methods and packing. Download PDF (95 KB) Paving grade bitumen — safety data sheet (MSDS) PDF, 117 KB — UN GHS, 16 sections; covers all 10 paving grades. Download MSDS (117 KB)
02 · CompareAH-70 · 60/70

AH-70 vs 60/70 bitumen

AH-70 and 60/70 side by side, with the test method for each limit.

Comparison of AH-70 and 60/70 specification limits
PropertyTest methodAH-7060/70
Penetration at 25 °C (0.1 mm)—60 – 80 · JTG E20 T 060460 – 70 · ASTM D5
Softening point (°C)—Min 46 · JTG E20 T 0606Min 46 · ASTM D36
Flash point (°C)—Min 260 · JTG E20 T 0611Min 250 · ASTM D92

Limits as published on the HOMAN AH-70 and 60/70 datasheets. 60/70 is the ASTM penetration grade with an overlapping range; substitution needs the engineer's written acceptance.

60/70 datasheet →

03 · ApplicationsWhere it goes

Specified for

01

Highway paving to GB/T specification

02

Asphalt concrete production

03

Chinese-standard tender supply

Highway & heavy traffic
05 · QualityDocumentation

Shipment quality documentation

Every lot is lab-tested in Bandar Abbas before shipment. Pre-shipment inspection is carried out by SGS or Geochem, as the buyer chooses. A Certificate of Analysis (COA) is issued for each order lot and tied to the batch number on the packaging.

SGS or Geochem inspectionCOA per order lotBatch-numberedCertificate of origin (Chamber of Commerce)

How to check bitumen quality and a COA →

07 · QuestionsBuyer FAQ

AH70 — common questions

What is AH-70 bitumen?

A heavy-traffic road bitumen grade (AH = heavy-traffic asphalt) defined in Chinese standard GB/T 15180, with penetration of 60–80 dmm at 25 °C.

Which standard defines AH-70 bitumen?

GB/T 15180, the Chinese national standard for heavy-traffic paving asphalt.

Is AH-70 the same as bitumen 60/70?

No. The penetration ranges overlap (60–80 vs 60–70), but AH-70 adds GB/T requirements such as ductility at 15 °C and TFOT retained penetration. Substitution needs the engineer's written acceptance.

Where is AH-70 bitumen used?

Highway paving and asphalt concrete production on projects written to GB/T, typically roads built by Chinese contractors.

What is the softening point of AH-70 bitumen?

Minimum 46 °C (JTG E20 T 0606), per the HOMAN AH-70 datasheet.

What is the density of AH-70 bitumen?

The datasheet gives density at 15 °C of 1.000–1.060; the lot value is reported on the COA.

What is the ductility of AH-70 bitumen?

Minimum 100 cm at 15 °C and minimum 20 cm at 10 °C (5 cm/min); after TFOT, minimum 6 cm at 10 °C.

What is the HS code for AH-70 bitumen?

HS 2713.20 (petroleum bitumen; national tariff suffixes vary).

How is AH-70 packed for export?

180 kg new steel drums, jumbo bags (300 kg, 1,000 kg or 1,300 kg), 20 MT flexitanks or bulk; each lot comes with a COA and SGS or Geochem inspection.

Active since 2016 · Exports to 11 countries · Offices in Tehran and Shenzhen · Minimum order: one container

Bulk · Drums · Jumbo bags · FlexitanksTrade desk quotation.

Specify the lot. Get a quotation.

Grade, tonnage, packaging, Incoterm and port — send those five lines and the trade desk issues a quotation.

Trade desk quotation on request.Every lot is lab-tested in Bandar Abbas before shipment. Pre-shipment inspection is carried out by SGS or Geochem, as the buyer chooses. A Certificate of Analysis (COA) is issued for each order lot and tied to the batch number on the packaging.

Request for quotationCOA per order lot

COA per order lot · Quotation on request.

Current commercial terms: under FOB, 30% advance payment and 70% against the agreed customs and shipping documents; under CFR, 30% advance payment and 70% after issuance of the Bill of Lading (B/L). EXW is also offered. Terms are agreed per contract.

Direct chartering or urgent vessel dispatch?

Direct Trade Desk
Price & Quotation Get a quote