HOMAN — Refined Supply GET A QUOTE
PavingASTM D946 · penetration grade 60–70

Bitumen 60/70 — Penetration Grade

The road-builder's constant. Balanced penetration and stability for high-volume paving across warm and temperate climates, and the usual feedstock for emulsion and cutback production.

In short

Bitumen 60/70 is the general-purpose penetration grade for warm and temperate roads: 60–70 dmm penetration at 25 °C and a minimum softening point of 46 °C. It is the default for high-volume asphalt and the usual feedstock for emulsion and cutback plants, shipped in drums, jumbo bags, flexitanks or bulk.

Grade choice

60/70 is the usual default for warm and temperate high-volume paving, and the common feedstock for emulsion and cutback production. Specify 40/50 instead for hotter, heavier corridors, or 80/100 where low-temperature flexibility governs.

Designation
Pen 60/70
Key property
Penetration 60–70 dmm @ 25 °C
Family
Paving
Documentation
COA per order lot
HOMAN 180 kg steel drum of Bitumen Penetration Grade 60/70, batch-numbered for export
180 kg drum · also jumbo bag, flexitank & bulk
01 · PropertiesTest methods

Technical properties

Each row names the test method the value is measured by, so your inspection lab can reproduce it.

Technical properties of Bitumen Penetration Grade 60/70 with test methods
PropertyUnitTest methodSpecification
Specific Gravity at 25 °C—ASTM D701.01–1.06
Penetration at 25 °C, 100g, 5s0.1 mmASTM D560–70
Softening Point°CASTM D36Min 46
Ductility at 25 °CcmASTM D113Min 100
Loss on Heating% m/mASTM D6Max 0.2
Drop in Penetration after Heating%ASTM D5Max 20
Flash Point°CASTM D92Min 250
Solubility in Trichloroethylene% m/mASTM D2042Min 99
Spot Test—AASHTO T102Negative

Limits per the HOMAN 60/70 technical datasheet. Penetration class per ASTM D946; each property is measured by the test method shown.

Datasheet issued by the HOMAN technical team · Lot testing: Bandar Abbas laboratory · Inspection: SGS or Geochem

Bitumen 60/70 — Penetration Grade — technical datasheet PDF, 88 KB — properties, test methods and packing. Download PDF (88 KB) Paving grade bitumen — safety data sheet (MSDS) PDF, 117 KB — UN GHS, 16 sections; covers all 10 paving grades. Download MSDS (117 KB)
HOMAN · export lot summary

Pen 60/70 bitumen: export lot test results (excerpt)

Excerpt of an SGS pre-shipment inspection report table for Pen 60/70 bitumen: penetration 67, softening point 48.6 °C, density 1025 kg/m³, flash point 316 °C
Excerpt shows penetration 67 (0.1 mm), softening point 48.6 °C and flash point 316 °C on an export lot.

Excerpt from an SGS pre-shipment inspection report; results reported by the producer's laboratory under SGS inspector observation. Full report shared with buyers on request.

02 · Compare60/70 · 40/50 · 80/100

60/70 vs 80/100 bitumen (and 40/50)

60/70, 40/50 and 80/100 side by side, with the test method for each limit.

Comparison of 60/70, 40/50 and 80/100 specification limits
PropertyTest method60/7040/5080/100
Penetration at 25 °C (0.1 mm)ASTM D560 – 7040 – 5080 – 100
Softening point (°C)ASTM D36Min 4652 – 6042 – 52
Flash point (°C)ASTM D92Min 250Min 250Min 225
Loss on heating (% m/m)ASTM D6Max 0.2Max 0.2Max 0.5

Limits as published on the HOMAN 60/70, 40/50 and 80/100 datasheets. 60/70 sits in the middle of the penetration ladder: harder than 80/100 for warm climates, softer than 40/50 for the hottest corridors.

40/50 datasheet → 80/100 datasheet →

03 · ApplicationsWhere it goes

Specified for

01

Asphalt concrete wearing and binder course

02

Emulsion and cutback feedstock

03

General high-volume paving

Highway & heavy trafficCold mix & patch repair
04 · PackagingLoading options

Packed for the voyage

Batch-numbered for traceability.

Quoted per metric ton by packaging, Incoterm and destination port. Send your port and tonnage for a written FOB or CFR quotation. View price board →

Port handlingReal shipment footage

From our shipments

Verified packaging staging and port handling for HOMAN Bitumen 60/70 jumbo bag consignments.

Port handling

Quayside forklift transfer

HOMAN Bitumen 60/70 jumbo bags quayside forklift transfer.

Quayside forklift transfer from container to vessel.

Cargo
Bitumen Pen 60/70
Packaging
1,000 kg jumbo bags

Quote 60/70 jumbo bags →

HOMAN bitumen packaging yard: open jumbo bag liners placed in steel cages awaiting filling
Packaging yard

Jumbo bags in steel cages

Rows of 1,000 kg jumbo bag liners in steel cages at the packaging facility before hot filling.

Meltable inner liners placed in rigid steel cage frames for shape stability during filling and transport.

Unit
1,000 kg FIBC in cage
Stage
Pre-filling setup

Packaging options →

HOMAN bitumen packaging yard: steel cage frame on wooden pallet for 1,000 kg jumbo bag packaging
Packaging yard

Steel cage & pallet

Empty steel cage frame on wooden pallet at the packaging yard, ready to receive jumbo bag liner.

Heavy-duty galvanized steel cage prevents bag bulging and allows safe container loading.

Frame
Galvanized cage
Base
Wooden pallet

Packaging options →

05 · QualityDocumentation

Shipment quality documentation

Every lot is lab-tested in Bandar Abbas before shipment. Pre-shipment inspection is carried out by SGS or Geochem, as the buyer chooses. A Certificate of Analysis (COA) is issued for each order lot and tied to the batch number on the packaging.

SGS or Geochem inspectionCOA per order lotBatch-numberedCertificate of origin (Chamber of Commerce)

How to check bitumen quality and a COA →

07 · QuestionsBuyer FAQ

Pen 60/70 — common questions

What does bitumen grade 60/70 mean?

It is a penetration grade: the standard needle test at 25 °C gives a reading between 60 and 70 tenths of a millimetre. It sits between the harder 40/50 and the softer 80/100.

What is bitumen 60/70 used for?

Asphalt concrete wearing and binder courses on general high-volume roads, and as the base bitumen for producing emulsions and cutbacks.

What is the difference between bitumen 60/70 and 80/100?

80/100 is softer (80–100 dmm, softening point 42–52 °C) and is meant for colder service temperatures; 60/70 (60–70 dmm, softening point min 46 °C) carries more traffic in warm climates without rutting.

What is the softening point of bitumen 60/70?

Minimum 46 °C by ring-and-ball (ASTM D36), per the HOMAN 60/70 datasheet.

What is the viscosity of bitumen 60/70?

The HOMAN 60/70 datasheet grades the product by penetration, not viscosity, so no viscosity limit is published. If your tender needs a viscosity value, ask for it to be tested and reported on the COA.

What is the HS code for bitumen 60/70?

HS 2713.20 (petroleum bitumen; national tariff suffixes vary), used on HOMAN commercial invoices and certificates of origin.

What is the density of bitumen 60/70?

Specific gravity is 1.01–1.06 at 25 °C (ASTM D70) per the datasheet; the measured value for your lot is on the COA.

What is the price of bitumen 60/70 today?

Prices are quoted per metric ton and depend on tonnage, packing (180 kg drum, jumbo bag of 300 kg to 1,300 kg, flexitank or bulk), Incoterm and destination port. Send those details for a current FOB or CFR quotation.

Is an MSDS available for bitumen 60/70?

Yes. The paving grade bitumen safety data sheet (GHS, 16 sections) covers 60/70. Download the PDF from this page, or request it from the trade desk.

Can I request a bitumen 60/70 quote for Kenya, Pakistan or the UAE?

Yes, you can request one. The HOMAN quotation form lists Mombasa (Kenya), Karachi Port and Port Qasim (Pakistan) and Jebel Ali (UAE) among its destination ports. Select your port and Incoterm; the trade desk confirms availability, routing and terms in the written quotation.

Is HOMAN Pen 60/70 bitumen tested before shipment?

Every lot is lab-tested in Bandar Abbas before shipment. Pre-shipment inspection is carried out by SGS or Geochem, as the buyer chooses. A Certificate of Analysis (COA) is issued for each order lot and tied to the batch number on the packaging. On an export lot inspected by SGS, the producer's laboratory reported penetration 67 (0.1 mm), softening point 48.6 °C and flash point 316 °C under SGS inspector observation.

Active since 2016 · Exports to 11 countries · Offices in Tehran and Shenzhen · Minimum order: one container

Bulk · Drums · Jumbo bags · FlexitanksTrade desk quotation.

Specify the lot. Get a quotation.

Grade, tonnage, packaging, Incoterm and port — send those five lines and the trade desk issues a quotation.

Trade desk quotation on request.Every lot is lab-tested in Bandar Abbas before shipment. Pre-shipment inspection is carried out by SGS or Geochem, as the buyer chooses. A Certificate of Analysis (COA) is issued for each order lot and tied to the batch number on the packaging.

Request for quotationCOA per order lot

COA per order lot · Quotation on request.

Current commercial terms: under FOB, 30% advance payment and 70% against the agreed customs and shipping documents; under CFR, 30% advance payment and 70% after issuance of the Bill of Lading (B/L). EXW is also offered. Terms are agreed per contract.

Direct chartering or urgent vessel dispatch?

Direct Trade Desk
Price & Quotation Get a quote